Actions
Show me jobs like this one
| Job Ref: | 79828 |
| Employer: |
Bechtel. |
| City: | Curtis Is. |
| State/Province: | Queensland |
| Country: | Australia |
| Industries: | Construction - Industrial Facilities and Infrastructure |
| Job Description: |
Requisition ID:
The Australia Pacific LNG (APLNG) Project is a coal seam gas (CSG) to liquefied natural gas (LNG) development project on Curtis Island, near Gladstone, Queensland. Gladstone is located approximately 450 kilometers north of Brisbane on the east coast of Australia. Australia Pacific LNG has Australia's largest CSG reserves position and is well placed to enable the creation of a world-class, long-term industry in Queensland, Australia. The Project consists of the development of the LNG plant which will have a processing capacity of up to 9 million tons per annum (Mtpa). Bechtel is performing the Engineering, Procurement and Construction (EPC) on the project. The project is scheduled for completion in late 2016 with a workforce primarily on a camp status, fly-in/fly-out basis. The project will be performed using a Bechtel Direct Hire workforce with select subcontract support. Role Overview The Australia Pacific LNG Plant Project is a grass roots, two train facility that will be constructed on Curtis Island (near Gladstone) Australia on a camp status, fly in/fly out basis for non-local personnel. It will be performed on a combination of Direct Hire and Construction Management of experienced specialist Australian Subcontracts methods. Unless otherwise indicated, applicants for construction positions should have heavy industrial Direct Hire experience commensurate with the type of work to be undertaken and the requirements identified below. Role Overview The Completions Coordinator:
Job Knowledge:
Work includes field inspections and the physical ability to conduct field inspections which require the following activities: extensive walking in and around a construction site, climbing ladders, climbing scaffolding, working on elevated platforms, working on uneven surfaces and working in small or confined spaces. Some lifting may be required. Must have the ability to walk into and out of the project (enter/egress). Must be able to use appropriate standard issued Personal Protection Equipment (PPE) required for each assigned task (i.e. harness, life vest, lift buckets, etc.) BOPS Guidelines include the minimum time that you need to be in your current position before applying to a new position. Please refer to the Guidelines and ensure you meet the minimum requirements. |
| Post Date: | 07/22/2013 |
|
|











